NORSOK D-SR-003-1994 System Requirements - Pipe handling system

免费
老杨树 2024-11-30 12 90.68KB 3 页 免费
侵权投诉
D-SR-003, Rev. 1, December 1994 page 1
NORSOK STANDARD
SYSTEM REQUIREMENTS
PIPE HANDLING SYSTEM
SYSTEM NO. 10-30
D-SR-003
Rev. 1, December 1994
Please note that whilst every effort has been made to ensure the accuracy of the NORSOK standards neither OLF nor TBL or any of their members
will assume liability for any use thereof.
1 FOREWORD
This standard has been developed by the NORSOK standardisation work group and agreed by the
Norwegian industry for the widest possible national and international application.
2 SCOPE
3 NORMATIVE REFERENCES
Recognised codes and standards for oil and gas industry.
4 DEFINITIONS AND ABBREVIATIONS
4.1 Definitions
4.2 Abbreviations
5 FUNCTIONAL REQUIREMENTS
5.1 General
The pipe handling system shall handle tubulars in connection with drilling operation.
5.2 Products/Services
D-SR-003, Rev. 1, December 1994 page 2
5.3 Equipment/Schematic
The system should consist of the following main items:
Pipehandling system in the derrick incl. fingerboard.
Iron roughneck.
Pipe handling system on the pipe deck.
Casing stabbing basket.
Casing tong (may be combined w/iron roughneck).
Catheads.
Rig tongs.
Mousehole(s).
5.4 Performance
Class I Class II
Fingerboard capacity, 5½" DP (stds) 120 190
Fingerboard capacity, 6 5/8" DP (stds) 100 130
Fingerboard capacity, 9 ½" DC (stds) 9 9
Fingerboard capacity, 6" DC (stds) 9 9
Total no. of stands 238 338
Iron roughneck m/u torque (kNm) 80 80
Iron roughneck b/o torque (kNm) 100 100
Iron roughneck tool joint diam. range w/o changing jaws (inch) 4½ - 8 4½ - 8
Casing tong diam. range (inch) 5-20 5-20
Catheads, force (mt) 12 12
Delivery of tubulars to/from drillfloor:9 5/8" casing (jts/hr)5" DP
(jts/hr)Max. tubular size (inch)
255020 255020
5.5 Regularity
5.6 Process/Ambient Conditions
North Sea environmental conditions shall apply.
5.7 Operational Requirements
The iron roughneck shall be able to perform mousehole connections.
The pipe handling system shall, by remote operation, handle tubulars within the pipe rack, from
pipe rack to drill floor and within the drillfloor/derrick area.
D-SR-003, Rev. 1, December 1994 page 3
It shall be possible to build stands in a safe and efficient manner while drilling. The building of
stands shall not hinder the possibility of breaking the drill string in rotary.
5.8 Maintenance Requirements
5.9 Isolation and Sectioning
5.10 Layout Requirements
5.11 Interface Requirements
5.12 Commissioning Requirements
Norsok HomePage
Send comments to NORSOK standards
摘要:

本页面提供关于NORSOK D-SR-003-1994标准规范的详细解读,该标准专门针对海上石油与天然气设施中的管道处理系统提出系统要求,涵盖了设计、功能、安全及操作维护等方面的技术准则。作为挪威石油工业公认的权威标准,NORSOK D-SR-003为管道处理系统的可靠性、防泄漏性能及与平台整体集成提供了关键指导,适用于工程公司、设备制造商及海洋工程领域的专业人员。通过深入理解该标准,用户可确保管道处理系统符合国际最佳实践,提升作业效率并降低安全风险。

展开>> 收起<<
NORSOK D-SR-003-1994 System Requirements - Pipe handling system.pdf

共3页,预览3页

还剩页未读, 继续阅读

声明:本文档系会员上传,若文档所含内容侵犯了您的版权或隐私,请立即通知,我们立即给予侵权申诉删除!
作者:老杨树 分类:国际标准 价格:免费 属性:3 页 大小:90.68KB 格式:PDF 时间:2024-11-30

开通VIP享超值会员特权

  • 多端同步记录
  • 高速下载文档
  • 免费文档工具
  • 分享文档赚钱
  • 每日登录抽奖
  • 优质衍生服务
/ 3
客服
关注