ACI 301:Specifications for Structural Concrete for Buildings -Summary

免费
老杨树 2025-01-07 24 31.12KB 3 页 免费
侵权投诉
A
CI 301 is a re f e rence standard which the engineer
or architect may make applicable to any building
project by citing it in the project specifications. He sup-
plements it as needed by designating or specifying indi-
vidual project requirements.
How ACI 301 is used
As its introduction explains, ACI 301 is incorpora t e d
into project specifications by re f e re n c e . For example, the
c o n t r act re q u i rements might read: “Co n c r ete work shall
c o n f o r m to all re q u i rements of ACI 301-72 (Re v i s e d
1981), Specifications for St ru c t u ral Co n c r ete for Bu i l d-
i n g s . If some part of ACI 301 is not appro p ri a t e, the
specifier can state any desired exc e p t i o n s.
So that the standard is not confused with an earlier
s t a n d a r d or an earlier revision, the year the standard was
adopted and the last year it was revised must be includ-
ed when re f e r encing it. ACI 301 was adopted as a stan-
d a r d by the American Co n c rete Institute in May 1972
and most recently revised in May 1981.
Supplementary requirements briefly added
ACI 301 is not complete in itself, though. The re q u i r e-
ments that va r y from project to project must be speci-
fied. A list of such re q u i rements is presented at the be-
ginning of ACI 301. Two of these re q u i rements must be
specified for all pro j e c t s :
the strength of the concrete for each portion of the
s t ru c t u re
the types and grades of re i n f o rcing steel
Other supplemental re q u i rements are designated on-
ly when they apply. Some examples are: the test age of
c o n c r ete if other than 28 days; the admixtures that are
re q u i red or prohibited; the types and strengths of pre-
s t ressing steel; and when re s h o ring is re q u i red or per-
m i t t e d .
It takes the specifier only about three pages to state
the mandatory supplementary re q u i re m e n t s — c o n c re t e
s t r ength and type of re i n f o r cement—plus those supple-
m e n t a r y re q u i r ements that pertain to the specific pro-
ject. The list of supplementary items at the beginning of
ACI 301 serves as a checklist; each item is keyed to sec-
tion numbers in the text.
Notes help contractor
At the end of each chapter are notes pointing out any
items which re q u i r e approval of the arc h i t e c t - e n g i n e e r
or other specifying authori t y. Items such as constru c t i o n
joints not shown on the dra w i n g s , pro p ri e t a r y patching
a g e n t s , or heavy-duty toppings are among those called
out. It is virtually impossible to overlook these sensitive
p o i n t s . They can be found by quick inspection at the end
of the chapters instead of having to scan the entire doc-
u m e n t .
What ACI 301 covers
This 36-page re f e rence standard is divided into 18
chapters (see box). Each chapter is further divided into
sections and subsections. Decimal numbering makes for
easy re f e r ence and shows the relationship of topics.
Why reference ACI 301?
The re q u i r ements of ACI 301 are standard specifica-
t i o n s , developed through a consensus process and ap-
p r oved by a group of industry pro f e s s i o n a l s. If followe d
c o r re c t l y, these specifications will produce quality con-
s t ruction. With repeated use, they become familiar, not
f r ightening. The contractor comes to know what the
ACI 301–Specifications for
Structural Concrete for Buildings
A reference standard good for both specifier and contractor
OTHER ACI REFERENCE SPECIFICATIONS
ACI 301 is a specification for stru c t u r al concrete in
b u i l d i n g s. It focuses on basic cast-in-place work and does
not deal with specialty concre t e s. Some other re f e re n c e
specifications available from ACI include the follow i n g :
5 0 3 . 1 - 7 9 Bonding Ha r dened Co n c re t e, Steel, Wood,
Brick, and Other Ma t e r ials to Ha rdened Co n
c r ete with a Multi-component Ep o xy
Ad h e s i v e
503.2-79 Bonding Plastic Co n c r ete to Ha rdened Co n
c r ete with a Multi-component Ep oxy
Ad h e s i v e
5 0 3 . 3 - 7 9 Producing a Sk i d - r esistant Su r face on Co n c re t e
by the Use of a Multi-component Ep ox y
Sy s t e m
503.4-79 Re p a i r ing Co n c r ete with Ep o xy Mo rt a r s
3 3 6 . 1 - 7 9 End Be a r ing Drilled Piers
3 4 6 - 8 1 Cast-in-place No n re i n f o rced Co n c rete Pipe
5 0 6 . 2 - 7 7 Ma t e ri a l s , Pro p o r tioning, and Application of
Sh o t c re t e
531.1-76 Co n c r ete Ma s o n r y Co n s t ru c t i o n
For more information, contact the American Co n c re t e
In s t i t u t e, Box 19150, De t roit, Michigan 48219.
s t a n d a r d says. He does not have to wade through the
e n t i r e concrete specification to avoid surpri s e s .
Re f e r encing ACI 301 saves the specifier time in wri t -
ing the project specifications. The contractor can be-
come familiar with the standard in advance and also
s a v e time. As long as ACI 301 is not re w ritten or re t y p e d ,
the contractor can assume he knows the perf o rm a n c e
l e v el re q u i r ed and read only the supplemental re q u i re-
ments and those parts he needs to re v i e w. On the other
hand, if the complete standard we r e entered into a word
p r ocessor and neatly printed out in the contract docu-
m e n t s , the bidder would still have to re r ead the materi-
al closely to be certain no changes we r e made—by acci-
dent or intention. ACI 301 thus saves time for both the
specifier and the contra c t o r, particularly when incor-
p o r ated by re f e re n c e .
Co p ying the standard is not necessary anyway. Se c -
tion 1.6 of ACI 301 re q u i r es the contractor to keep at
least one copy of the ACI Field Re f e rence Manual, SP-15
( 8 1 ) , in his field office at all times. The field manual con-
tains ACI 301 and other selected ACI and ASTM re f e r -
e n c e s . Published by the American Co n c rete In s t i t u t e ,
SUBJECTS COVERED IN AACI 301 CHAPTERS
1–GENERAL: Defines certain words used in
ACI 301 and lists ASTM and other standards cit-
ed in ACI 301.
2 – M ATERIALS FOR CONCRETE: Re f e re n c e s
ASTM standards for materials and tells how ma-
t e rials should be store d .
3 – P RO P O RTIONING: Three methods based
on (1) trial mixes, (2) past field test data, and (3)a
c h a r t indicating maximum water-cement ra t i o,
and slump are specified. Chart classifies con-
c r ete floors by use and gives minimum stre n g t h
and maximum slump for each.
4 – F O R M W ORK: Design and installation of
f o rm w o rk: pre p a r ation of form surfaces; re-
m o val of forms; and re s h o r ing. Chart lists toler-
ances for va rious formed surf a c e s .
5 – R E I N F O RC E M E N T: Co n c rete cover over re-
i n f o r cement; overlap of wire fabric re i n f o rc e -
ment; supporting and fastening re i n f o rc e m e n t ;
and tolerances in fabrication rebar placement.
ASTM specifications are re f e re n c e d .
6 – J O I N T S AND EMBEDDED ITEMS: Location
and construction of joints; methods for bonding
joints; types of expansion joint filler. Re q u i re-
ments for waterstops and placing embedded
i t e m s .
7 – P R ODUCTION OF CO N C R E T E : Re q u i r e-
ments for batching and mixing, for pro d u c i n g
l i g h t w eight concre t e, and for adding admixture s
and mix water. Cites ASTM standards for re a d y
mixed concrete and for concrete produced by
on-site vo l u m e t r ic batching and continuous
m i x i n g .
8 – P LACING: Method of vibration, limits on
placing tempera t u re and pre p a r ation of joints
for bonding. Gi ves re q u i r ements for truck mix-
e r s , belt conve yo r s, chutes, and pumping equip-
m e n t .
9 – R E PAIR OF SURFACE DEFECTS: How to
p re p a r e the surface and mix grout and patching
c o m p o u n d .
10–FINISHING OF FORMED SURFAC E S :
Methods for as-cast finishes and rubbed finish-
es such as grout cleaned or cork floated.
1 1 – S L ABS: Co n s t r uction of two-course slabs
and how to do the following finishes: scra t c h e d ,
floated, troweled, broom or belt, dry shake, ex-
posed aggre g a t e, and non-slip.
12–CURING AND PROTECTION: How and
h o w long to cure. Pro t e c t i v e measures against
wind and hot or cold tempera t u re s .
13– ARCHITECTURAL CO N C R E T E : L o c a t i o n
of joints and form ties; form deflections allowe d ;
and the re q u i rements for pro p o rtioning mixes,
patching surf a c e s , and forming arc h i t e c t u ra l
f i n i s h e s .
14–MASSIVE CO N C R E T E : Ma t e r ial, pro p o r -
tioning, placing, curing and protection re q u i r e-
m e n t s .
15–PRESTRESSED CONCRETE: Definition of
p re s t ressing terms; re q u i r ements for tendons,
a n c h o ra g e s, couplings, sheathing, and gro u t .
Methods for placing and protecting tendons,
applying pre s t r essing forc e , and gro u t i n g .
16–TESTING: Which tests must be made and
h o w often to make them. Who makes tests, and
who pays for them.
1 7 – E VA LUATION AND ACC E P TANCE OF
CONCRETE: Va riation allowed in concrete test
s t r engths; use of in-place testing, especially core
t e s t s .
1 8 – ACC E P TANCE OF STRUCTURE: Di m e n -
sional tolerance and appearance necessary.
Conditions which might impair the strength of a
s t ru c t u re.
the manual costs $21.50 to ACI members and $28.50 to
n o n m e m b e r s . ACI also makes copies of ACI 301 suitable
for binding into project specifications.
How ACI 301 relates to the ACI 318 Building
Code
Un f o r tunately some specifiers incorporate ACI 318
by re f e re n c e , instead of using ACI 301. This is not good
p ra c t i c e. ACI 318,Building Code Re q u i rements for Re-
i n f o r ced Co n c re t e,” is written so it may be adopted by
re f e r ence in a general building code. It is intended as
public law, not a specification.
Though compatible and consistent with ACI 318, AC I
301 is different. While ACI 318 presents minimum re-
q u i rements for public safety, ACI 301 presents above -
minimum construction re q u i re m e n t s. Fo l l owing AC I
318 guarantees safe design, not good constru c t i o n .
Specifiers should there f o r e re f e rence 301, not 318. Re f e r -
encing 318 may tend to make the contractor re s p o n s i b l e
for design questions which should be handled by the
a rc h i t e c t - e n g i n e e r.
PUBLICATION #C830451
Co py r ight © 1983, The Ab e r deen Gro u p
All rights re s e rve d
摘要:

ACI 301是混凝土建筑领域核心的规范标准,全称为《建筑物结构混凝土施工规范》,其摘要版本为工程师、承包商和质检人员提供了关键的技术指引。本摘要涵盖了从材料选择、配合比设计、浇筑、养护到检测验收的全流程要求,包括对钢筋间距、模板误差、强度测试频率及裂缝控制等关键条款的提炼。该文档帮助专业人员快速掌握符合ACI 301-20(或对应版本)的结构混凝土施工质量基准,确保建筑物在承载力、耐久性与安全性方面符合国际公认的工程实践。无论是用于项目投标、现场施工管理还是规范培训,这份摘要都能显著提升对规范

展开>> 收起<<
ACI 301:Specifications for Structural Concrete for Buildings -Summary.pdf

共3页,预览3页

还剩页未读, 继续阅读

声明:本文档系会员上传,若文档所含内容侵犯了您的版权或隐私,请立即通知,我们立即给予侵权申诉删除!
作者:老杨树 分类:国外协会 价格:免费 属性:3 页 大小:31.12KB 格式:PDF 时间:2025-01-07

开通VIP享超值会员特权

  • 多端同步记录
  • 高速下载文档
  • 免费文档工具
  • 分享文档赚钱
  • 每日登录抽奖
  • 优质衍生服务
/ 3
客服
关注