沙特阿美公司标准 英文版 PMT10510项目竣工移交和收尾

VIP免费
那山那人那狗 2025-03-14 47 65.82KB 18 页 14星币
侵权投诉
Note: The source of the technical material in this volume is the Professional
Engineering Development Program (PEDP) of Engineering Services.
Warning: The material contained in this document was developed for Saudi
Aramco and is intended for the exclusive use of Saudi Aramco’s employees.
Any material contained in this document which is not already in the public
domain may not be copied, reproduced, sold, given, or disclosed to third
parties, or otherwise used in whole, or in part, without the written permission
of the Vice President, Engineering Services, Saudi Aramco.
Chapter : Project Management For additional information on this subject, contact
File Reference: PMT10510 Rod Kuan on 873-9701
Engineering Encyclopedia
Saudi Aramco DeskTop Standards
Project Completion Turnover And Close-Out
Engineering Encyclopedia Project Management
Project Completion Turnover And Close-Out
Saudi Aramco DeskTop Standards
Content Page
CONSTRUCTION ISSUES RELATED WITH THE MECHANICAL
COMPLETION.................................................................................................................... 1
Priority in Transferring Constructed Facilities............................................................ 1
Punch-Listing............................................................................................................ 2
Punch-Listing by SAPMT and Contractor...................................................... 2
Punch-Listing by SAPMT and Acceptance Committee................................... 3
Acceptance Procedures for Mechanical Completion................................................... 4
Mechanical Completion.................................................................................. 4
Acceptance Procedure ................................................................................... 4
ROLE OF THE SAUDI ARAMCO CONSTRUCTION MANAGEMENT TEAM IN
ENSURING EFFICIENT COMMISSIONING AND TURNOVER...................................... 6
Coordination Procedures Between Construction and Start-up Teams......................... 6
Construction Management Team Responsibilities and Interfaces................................ 6
Acceptance Committee.............................................................................................. 8
PERFORMING PROJECT CLOSE-OUT OF THE CONSTRUCTED FACILITIES...........10
Mechanical Completion Certificate ...........................................................................10
Performance Acceptance Certificate .........................................................................10
Performance Acceptance Procedure..............................................................11
Contractor Demobilization .......................................................................................12
Checklist of Project Close-Out Activities..................................................................13
GLOSSARY........................................................................................................................14
ADDENDUM......................................................................................................................15
Engineering Encyclopedia Project Management
Project Completion Turnover And Close-Out
Saudi Aramco DeskTop Standards 1
CONSTRUCTION ISSUES RELATED WITH THE MECHANICAL COMPLETION
Priority in Transferring Constructed Facilities
To ensure smooth start-up and commissioning, a priority sequence of completed facilities should
be established. The construction plans should reflect the sequence in which the utilities, offsites
and process units will be completed and transferred to Saudi Aramco's Operations Department.
As the project nears completion in the field, the construction management approach to the field
execution also goes through distinct changes. The construction effort gets more focused on
completing the "process systems" rather than physical work areas. This ensures that the
operations can commission the facilities from a "Systems Approach" as per their start-up plans.
A detailed Systems Completion Schedule is developed, which shows the sequence in which the
systems will be completed and transferred to the operations department. The punch list or
exception lists of incomplete construction items is developed for each system. The construction
effort is directed to complete these incomplete items prior to transfer of the process systems to
the operations.
This proper "system turnover sequence" facilitates the efficient start-up of the facilities. For
example, an early turnover of a process unit will not serve the company's start-up effort if the
control room and electrical facilities are not completed and commissioned on time.
Below is an example of the preferred turnover sequence for the utilities/off-site facilities in order
to best support the start-up of process units.
FACILITIES PRIORITY
Control Room 1
Storage & Blending 2
Interconnecting Piping 2
Fuel Gas/Fuel Oil System 3
Cooling Water and Firewater Systems 3
Waste Treating 3
Potable Water System 3
Filtered Water System 3
Electrical Facilities 4
Flare System 4
Emergency Power Generation 5

标签: #PM #沙特

摘要:

本页面详细介绍沙特阿美公司标准英文版 PMT10510 关于项目竣工移交和收尾的关键要求与实施指南。该标准适用于石油、天然气及化工领域大型工程项目的最终阶段,涵盖了从实体竣工检查、系统移交测试、竣工文件整理,到合同结算与项目验收的完整流程。通过遵循 PMT10510,项目团队能够确保所有交付物符合阿美公司的质量与安全规范,明确业主与承包商在移交阶段的职责分工,并有效管理遗留问题与保修期责任。理解并应用这一标准,有助于减少项目收尾期的延误与争议,提升项目关闭效率,为后续运营提供可靠的资产基础资料。

展开>> 收起<<
沙特阿美公司标准 英文版 PMT10510项目竣工移交和收尾.pdf

共18页,预览4页

还剩页未读, 继续阅读

声明:本文档系会员上传,若文档所含内容侵犯了您的版权或隐私,请立即通知,我们立即给予侵权申诉删除!
作者:那山那人那狗 分类:国际标准 价格:14星币 属性:18 页 大小:65.82KB 格式:PDF 时间:2025-03-14

开通VIP享超值会员特权

  • 多端同步记录
  • 高速下载文档
  • 免费文档工具
  • 分享文档赚钱
  • 每日登录抽奖
  • 优质衍生服务
/ 18
客服
关注