ISPE良好规范指南--供暖、通风和空调 ISPE Heating, Ventilation, and Air Conditioning (HVAC)

VIP专免
那山那人那狗 2025-06-26 145 9.88MB 288 页 15星币
侵权投诉
This Document is licensed to
Mr. Gerardo Gutierrez, Sr.
Mexico, DF,
ID number: 299643
Downloaded on: 10/5/11 2:26 PM
This Document is licensed to
Mr. Gerardo Gutierrez, Sr.
Mexico, DF,
ID number: 299643
Downloaded on: 10/5/11 2:26 PM
Your drug goes from
benchtop to blockbuster.
Faster.
Your regulatory approval
and profi ts arrive sooner.
Better.
Your products and services
set industry standards.
Smarter.
At Southland, we know that speed to market is crucial, but not at the expense of quality or
compliance. When you partner with us, we’ll Design • Build • Maintain mechanical systems
that are both cutting edge and in keeping with regulations, making it easier to meet cGMP/
GLP requirements, validate your systems and pass quality and regulatory audits.
Life Science Authorities in R&D Labs, Biocontainment and cGMP Manufacturing Facilities.
Trust Your Life Sciences
Mechanical Systems to Southland.
HVAC
Process Piping
Plumbing
Fire Protection
Controls & Automation
Energy Analysis
Planning & Development
Project Management
Maintenance
Repair & Retrofi t
www.southlandind.com
LifeSciences@southlandind.com
East Coast: 703.834.5570
West Coast: 949.440.5000
This Document is licensed to
Mr. Gerardo Gutierrez, Sr.
Mexico, DF,
ID number: 299643
Downloaded on: 10/5/11 2:26 PM
Table of Contents
Preface ......................................................................................................................................... 4
Acknowledgements .................................................................................................................... 5
1 Introduction ......................................................................................................................... 7
1.1 Background ..................................................................................................................................................7
1.2 Purpose ........................................................................................................................................................7
1.3 Scope ...........................................................................................................................................................7
1.4 Benets ........................................................................................................................................................8
1.5 Objectives ....................................................................................................................................................9
1.6 KeyConcepts...............................................................................................................................................9
1.7 Structure ....................................................................................................................................................17
2 Design Process ................................................................................................................. 19
2.1 Introduction ................................................................................................................................................19
2.2 DevelopingUserRequirements .................................................................................................................23
2.3 HVACSystemRiskAssessment ................................................................................................................35
2.4 ProgrammingforDetailDesign ..................................................................................................................40
3 Design Considerations ..................................................................................................... 45
3.1 Introduction ................................................................................................................................................45
3.2 GeneralDesignConsiderations .................................................................................................................45
3.3 AirFlowDiagramsbyFacilityType ............................................................................................................50
3.4 ActivePharmaceuticalIngredients(APIs)–(WetEnd) .............................................................................50
3.5 ActivePharmaceuticalIngredients(APIs)–(DryEnd) ..............................................................................51
3.6 Biologics .....................................................................................................................................................52
3.7 OralSolidDosage(Non-PotentCompounds) ............................................................................................54
3.8 OralSolidDosage(PotentCompounds)....................................................................................................57
3.9 AsepticProcessingFacility ........................................................................................................................60
Heating,
Ventilation, and
Air Conditioning (HVAC)
For individual use only. © Copyright ISPE 2009. All rights reserved.

标签: #ISPE

摘要:

本指南为制药与生物技术行业提供基于ISPE良好规范框架的供暖、通风和空调(HVAC)系统设计与验证核心参考,涵盖HVAC系统在受控环境中的关键作用,包括温湿度控制、空气洁净度管理、压差维护及能源优化策略。内容适用于洁净室、隔离区及无菌生产设施,强调风险合规与运行可靠性,帮助工程师与质量人员满足cGMP及国际监管要求,同时提升系统能效与维护效率。

展开>> 收起<<
ISPE良好规范指南--供暖、通风和空调 ISPE Heating, Ventilation, and Air Conditioning (HVAC).pdf

共288页,预览3页

还剩页未读, 继续阅读

声明:本文档系会员上传,若文档所含内容侵犯了您的版权或隐私,请立即通知,我们立即给予侵权申诉删除!
作者:那山那人那狗 分类:国外协会 价格:15星币 属性:288 页 大小:9.88MB 格式:PDF 时间:2025-06-26

开通VIP享超值会员特权

  • 多端同步记录
  • 高速下载文档
  • 免费文档工具
  • 分享文档赚钱
  • 每日登录抽奖
  • 优质衍生服务
/ 288
客服
关注