BS EN 61850-4-2011 + A1-2020 用于电力公用事业自动化的通信网络和系统 系统和项目管理

VIP专免
史蒂文 2026-01-29 11 2.28MB 54 页 20星币
侵权投诉
BSI Standards Publication
Communication networks and systems
for power utility automation
Part 4: System and project management
BS EN 61850‑4:2011+A1:2020
EUROPEAN STANDARD
NORME EUROPÉENNE
EUROPÄISCHE NORM
EN 61850-4:2011+A1
December 2020
ICS 33.200
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels
© 2020 CENELEC
All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
Ref. No. EN 61850-4:2011/A1:2020 E
English version
Communication networks and systems for power utility automation -
Part 4: System and project management
(IEC 61850-4:2011)
Réseaux et systèmes de communication
pour l'automatisation des systèmes
électriques -
Partie 4: Gestion du système et gestion de
projet
(CEI 61850-4:2011)
Kommunikationsnetze und -systeme in
Stationen -
Teil 4: System- und Projektverwaltung
(IEC 61850-4:2011)
This European Standard was approved by CENELEC on 2011-05-16. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the Central Secretariat or to any CENELEC member.
This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the Central Secretariat has the same status as the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus,
the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy,
Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia,
Spain, Sweden, Switzerland and the United Kingdom.
National foreword
This British Standard is the UK implementation of
EN 61850‑4:2011+A1:2020. It is identical to IEC 61850‑4:2011,
incorporating amendment 1:2020. It supersedes BS EN 61850‑4:2011,
which is withdrawn.



 .
The UK participation in its preparation was entrusted to Technical



request to its committee manager.


© The British Standards Institution 2020

ISBN 978 0 580 51325 1
ICS 33.040.40; 33.200
Compliance with a British Standard cannot confer immunity from
legal obligations.


Amendments/corrigenda issued since publication
Date 
 Implementation of IEC amendment 1:2020 with
CENELEC endorsement A1:2020
BRITISH STANDARD
BS EN 61850‑4:2011+A1:2020
EN 61850-4:2011+A1
December 2020
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels
© 2020 CENELEC
All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
Ref. No. EN 61850-4:2011/A1:2020 E
English version
Communication networks and systems for power utility automation -
Part 4: System and project management
(IEC 61850-4:2011)
Réseaux et systèmes de communication
pour l'automatisation des systèmes
électriques -
Partie 4: Gestion du système et gestion de
projet
(CEI 61850-4:2011)
Kommunikationsnetze und -systeme in
Stationen -
Teil 4: System- und Projektverwaltung
(IEC 61850-4:2011)
This European Standard was approved by CENELEC on 2011-05-16. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the Central Secretariat or to any CENELEC member.
This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the Central Secretariat has the same status as the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus,
the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy,
Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia,
Spain, Sweden, Switzerland and the United Kingdom.
BS EN 61850‑4:2011+A1:2020

标签: #管 #公用事业

摘要:

BS EN 61850-4-2011 + A1-2020 是电力公用事业自动化领域的重要国际标准,专注于通信网络和系统中系统和项目管理的规范要求。该标准作为 IEC 61850 系列的核心组成部分,定义了从系统设计、工程实施到运行维护的全生命周期管理框架,确保变电站自动化、分布式能源接入及智能电网设备间的互操作性。通过明确系统配置、项目文档管理、一致性测试及生命周期维护流程,该标准有效提升了电力自动化系统的可靠性、安全性与集成效率。其 2011 年版本与 2020 年增补修订(A1)进一步纳入了

展开>> 收起<<
BS EN 61850-4-2011 + A1-2020 用于电力公用事业自动化的通信网络和系统 系统和项目管理.pdf

共54页,预览3页

还剩页未读, 继续阅读

声明:本文档系会员上传,若文档所含内容侵犯了您的版权或隐私,请立即通知,我们立即给予侵权申诉删除!
作者:史蒂文 分类:国际标准 价格:20星币 属性:54 页 大小:2.28MB 格式:PDF 时间:2026-01-29

开通VIP享超值会员特权

  • 多端同步记录
  • 高速下载文档
  • 免费文档工具
  • 分享文档赚钱
  • 每日登录抽奖
  • 优质衍生服务
/ 54
客服
关注