NACE SP0116-2022

VIP专免
Carl 2024-09-06 114 2.25MB 66 页 17星币
侵权投诉
NACE SP0116-2022
Revised May 6, 2022
Multiphase Flow Internal Corrosion
Direct Assessment (MP-ICDA)
Methodology for Pipelines
©2022 Association for Materials Protection and Performance (AMPP). All rights reserved. No part of this publication may be
reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording,
or otherwise) without the prior written permission of AMPP.
NACE SP0116-2022
NACE SP0116-2022
©2022 Association for Materials Protection and Performance (AMPP). All rights reserved.
2
Multiphase Flow Internal Corrosion
Direct Assessment (MP-ICDA)
Methodology for Pipelines
This AMPP standard represents a consensus of those individual members who have reviewed this document, its scope,
and provisions. Its acceptance does not in any respect preclude anyone, whether he or she has adopted the standard
or not, from manufacturing, marketing, purchasing, or using products, processes, or procedures not in conformance with
this standard. Nothing contained in this AMPP standard is to be construed as granting any right, by implication or other-
wise, to manufacture, sell, or use in connection with any method, apparatus, or product covered by Letters Patent, or as
indemnifying or protecting anyone against liability for infringement of Letters Patent. This standard represents minimum
requirements and should in no way be interpreted as a restriction on the use of better procedures or materials. Neither
is this standard intended to apply in all cases relating to the subject. Unpredictable circumstances may negate the use-
fulness of this standard in specific instances. AMPP assumes no responsibility for the interpretation or use of this stan-
dard by other parties and accepts responsibility for only those official AMPP interpretations issued by AMPP in accor-
dance with its governing procedures and policies which preclude the issuance of interpretations by individual volunteers.
Users of this AMPP standard are responsible for reviewing appropriate health, safety, environmental, and regulatory
documents and for determining their applicability in relation to this standard prior to its use. This AMPP standard may
not necessarily address all potential health and safety problems or environmental hazards associated with the use of
materials, equipment, and/or operations detailed or referred to within this standard. Users of this AMPP standard are
also responsible for establishing appropriate health, safety, and environmental protection practices, in consultation with
appropriate regulatory authorities, if necessary, to achieve compliance with any existing applicable regulatory require-
ments prior to the use of this standard.
CAUTIONARY NOTICE: AMPP standards are subject to periodic review and may be revised or withdrawn at any time
in accordance with AMPP technical committee procedures. AMPP requires that action be taken to reaffirm, revise, or
withdraw this standard no later than five years from the date of initial publication and subsequently from the date of each
reaffirmation or revision. The user is cautioned to obtain the latest edition. Purchasers of AMPP standards may receive
current information on all standards and other AMPP/NACE/SSPC publications by contacting AMPP Customer Support,
15835 Park Ten Place, Houston, Texas 77084-5145 (Tel: +1 281-228-6200, email: customersupport@ampp.org).
Document History
2022-05-06: Revised by AMPP Standards Committee (SC) 10, “Asset Integrity Management”
2016-02-12: Developed by NACE Task Group (TG) 426,
“Internal Corrosion Direct Assessment for Multiphase Flow Pipelines”
AMPP values your input. To provide feedback on this standard, please contact: standards@ampp.org
NACE SP0116-2022
©2022 Association for Materials Protection and Performance (AMPP). All rights reserved.
3
Multiphase Flow Internal Corrosion
Direct Assessment (MP-ICDA)
Methodology for Pipelines
Foreword, Scope, Rationale ........................................................................................................................................... 5
Section 1 General .................................................................................................................................................... 6
1.1 Introduction ................................................................................................................................. 6
1.2 Four-Step Process...................................................................................................................... 7
Section 2 Definitions .............................................................................................................................................................. 13
Section 3 MP-ICDA Step 1—Pre-Assessment ....................................................................................................... 16
3.1 Introduction ............................................................................................................................... 16
3.2 Data Collection ......................................................................................................................... 16
3.3 MP-ICDA Feasibility Assessment ............................................................................................. 20
3.4 Identification of MP-ICDA Segments .................................................................................................. 21
3.5 Identification of MP-ICDA Regions ..................................................................................................... 21
Section 4 MP-ICDA Step 2—Indirect Inspection ..................................................................................................... 21
4.1 Introduction ............................................................................................................................... 21
4.2 Flow and Corrosion Rate Modeling ........................................................................................... 23
4.3 Internal Corrosion Predictive Models Integrated Flow and Corrosion Models ........................ 24
4.4 Identification of MP-ICDA Subregions................................................................................................ 25
4.5 Assessment Site Selection ....................................................................................................... 25
Section 5 MP-ICDA Step 3—Detailed Examination ................................................................................................ 30
5.1 Introduction ............................................................................................................................... 30
5.2 Performing the Detailed Examination Process ......................................................................... 32
5.3 Assessment Site Exposure ....................................................................................................... 33
Section 6 MP-ICDA Step 4—Post-Assessment ...................................................................................................... 34
6.1 Introduction ............................................................................................................................... 34
6.2 Validation of the Process .......................................................................................................... 34
6.3 Assessment of MP-ICDA Long-Term Effectiveness .................................................................. 34
6.4 Determination of Re-assessment Intervals ............................................................................... 35
Section 7 MP-ICDA Records .................................................................................................................................. 35
7.1 Introduction ............................................................................................................................... 35
7.2 Pre-assessment ........................................................................................................................ 35
7.3 Indirect Inspection .................................................................................................................... 35
7.4 Detailed Examinations .............................................................................................................. 35
7.5 Post-assessment ...................................................................................................................... 36
References ................................................................................................................................................................... 36
摘要:

NACE SP0116-2022 是由国际腐蚀工程师协会(NACE International,现为AMPP)发布的最新版标准规范,全称为“Standard Practice: Corrosion Management of Oil and Gas Production Facilities”。该标准为石油和天然气生产设施的腐蚀管理提供了系统化的技术框架与实施指南,涵盖了风险评估、监控方法、材料选择、防护措施及持续改进策略等关键环节。NACE SP0116-2022 适用于海上与陆上油气生产系统

展开>> 收起<<
NACE SP0116-2022.pdf

共66页,预览4页

还剩页未读, 继续阅读

声明:本文档系会员上传,若文档所含内容侵犯了您的版权或隐私,请立即通知,我们立即给予侵权申诉删除!
作者:Carl 分类:国外协会 价格:17星币 属性:66 页 大小:2.25MB 格式:PDF 时间:2024-09-06

开通VIP享超值会员特权

  • 多端同步记录
  • 高速下载文档
  • 免费文档工具
  • 分享文档赚钱
  • 每日登录抽奖
  • 优质衍生服务
/ 66
客服
关注