the sides of the specimen, the over-all length of the specimen
shall exceed the gauge length by at least 50 mm [2 in.].
NOTE 1—Specimens used for length change measurements during
freeze thaw resistance testing as described in Test Method C666/C666M
should follow the dimensional requirements of that method.
8. Setting Gauge Studs
8.1 Gauge studs shall either be cast in place, dry-set or
cemented in drilled holes, or cemented directly to the surface
of the specimen.
8.2 Drilling Holes—For gauge studs that are to be
cemented, holes shall be drilled (Note 2) only slightly larger
than the studs. For gauge studs that are to be dry-set, holes shall
be drilled about 0.1 mm [0.005 in.] smaller in diameter than the
studs. In the case of small specimens, take care that the
specimens are not damaged by the drilling operation. The
location and depth of holes shall be as given in 8.2.1 and 8.2.2.
NOTE 2—Carbide-tipped masonry drills have been found most suitable
for this purpose.
8.2.1 For Gauge Studs in Ends of Specimen—Drill holes in
the ends of a specimen so that their longitudinal axes coincide
with the longitudinal axis of the specimen. The depth of the
holes shall be such that the gauge studs will project from 3 to
5mm[
1
⁄
8
in. to
3
⁄
16
in.] beyond the ends of the specimen.
8.2.2 For Gauge Studs in Sides of Specimen—Drill a pair of
holes in each of two opposite sides of the specimen to
compensate for warping and to provide a better average for
length change. Position both pairs of holes in a plane contain-
ing the longitudinal axis of the specimen and space to conform
to the length of the comparator. The center of each hole shall
be at least 25 mm [1 in.] from the end of the specimen. The
depth of the holes shall preferably be such that the top surfaces
of the gauge studs can be set about 3 mm [0.1 in.] below the
surface of the specimen.
8.3 Cementing Methods:
8.3.1 Studs Set in Holes—Position gauge studs in holes at
the depth specified in 8.2.1 or 8.2.2, as appropriate, with the
exposed end parallel to the surface of the specimen in the case
of studs having plane end surfaces. The cementing material
shall be stable and effective in either a wet or dry environment
and at temperatures up to 120 °C [250 °F]. The following
cementing materials have been found satisfactory:
8.3.1.1 Epoxy Resin—Epoxy resins for this purpose shall
cure at room temperatures and not soften upon exposure to
water immersion. Holes shall be free of loose particles and
visually dry to ensure good bond.
8.3.1.2 Portland-Cement Paste—Use a thick paste of Type
III Portland cement. Moisten each hole with about 5 mL of
water, cement the studs in place after the water has been
absorbed, and moist-cure the paste for approximately 24 h.
8.3.1.3 Other Cementing Media—Sulfur and Rose metal
have also proven satisfactory.
8.3.2 Studs Cemented to Surface—An epoxy resin system
that cures at room temperature and does not soften at a
temperature of 120 °C [250 °F] or soften upon exposure to
water immersion is the most satisfactory material for cement-
ing studs to the surface of a specimen. To ensure good bond, it
is essential that the surface be clean. Acid etching followed by
flushing with water and drying is a satisfactory preparation of
the surface for bonding. The locations of the studs on the
specimen are the same as those prescribed for drilled holes in
8.2.1 and 8.2.2. The exposed end surface of each stud having
a plane end surface shall be parallel to the surface of the
specimen.
8.4 Dry-Setting Method—Drive the gauge studs to the depth
specified in 8.2.1 or 8.2.2, as appropriate, into holes that are
approximately 0.1 mm [0.005 in.] smaller in diameter than the
gauge studs, being careful not to deform the exposed ends of
the gauge studs during the driving operation.
8.5 Reference Points on Gauge Studs—On each gauge stud
located on the side of a specimen, establish a reference point by
drilling a hole approximately 1 mm in diameter (see Note 3)in
the end of the stud to a depth sufficient to provide clearance
between the bottom of the hole and the point of the comparator,
as shown in Fig. 1. A template (Fig. 1) will aid in spacing the
holes at proper gauge length, which shall be as nearly equal to
the mean gauge length of the comparator as practicable.
Remove burred edges from the reference point holes.
NOTE 3—A No. 56 American Standard Twist Drill or other bit suitable
to drill a hole approximately 1 mm or 0.046 in. in diameter is suitable for
this purpose.
9. Determination of Gauge Length of Specimens
9.1 Determine the gauge length of each specimen to an
accuracy of 1 %. In the case of specimens having gauge studs
on the sides, determine the gauge length by direct measurement
between the reference points with a suitable scale. Determine
the gauge length of specimens having gauge studs in the ends
by first measuring the distance between the ends of the gauge
studs with suitable calipers and subtracting the lengths of the
two gauge studs.
10. Conditioning of Specimens for Measurement of Base
Length
10.1 Prior to the initial measurement for length, condition
specimens by immersion in lime-saturated water.
10.2 Maintain the temperature of the conditioning water at
23 62 °C [73.5 63.5 °F], except that during the last1hof
immersion immediately before making any measurement for
length maintain the temperature at 23.0 60.5 °C [73.4 61.0
°F] (Note 4). When measuring for length, remove the speci-
mens from water one at a time, wipe with a damp cloth, and
immediately measure for length using the comparator specified
in 5.1. Make length measurements at 7-day intervals and
continue conditioning until the change in length over a 7-day
period is less than 0.001 %. Use the length measurement that
determines that this criterion is met as the basis for calculating
length change occurring during the air or water storage period.
NOTE 4—Specimens used for length change measurements during
freeze thaw resistance testing as described in Test Method C666/C666M
should follow the conditioning of that method.
C341/C341M − 18
3