6.17 Small Tools—Small tools such as a rubber-headed
hammer and a trowel shall be provided.
7. Materials and Proportions
7.1 Cement—The cement used shall be Type I or Type III
portland cement meeting the requirements of Specification
C150/C150M.
7.2 Water-Cement Ratio—The water requirement will vary
with the type and source of cement. For the purpose of these
tests, w/c = 0.58 for Type I cement and w/c = 0.64 for Type III
cement shall be used. However, if a particular cement or
foaming agent used with these values of w/c does not produce
a satisfactory mix, a trial mix or mixes may be made using a
different water-cement ratio.
7.3 Batch Quantities—The cement quantity shall be suffi-
cient to allow molding all the test specimens from one test
batch. The mixture water-cement ratio determined from 7.2
shall be used to make the test batch.
7.3.1 The foaming solution in the foam shall be considered
as part of the total mixing water. Foam volume shall be
adjusted for the batch to produce a density after pumping of
640 650 kg/m
3
[40 63 lb/ft
3
].
8. Procedure
8.1 Make an aqueous solution of the foaming agent in the
dilution specified by the manufacturer. If the dilution is not
specified, preliminary tests are necessary to determine the
required dilution. A suggested starting point for such tests is 40
parts water to 1 part foaming agent, by volume.
8.2 Charge the foam generator with the amount of foaming
solution suggested by the manufacturer of the generator.
8.3 Connect the generator with the source of compressed
air, adjusting the pressure to that recommended by the manu-
facturer of the foaming agent being tested.
8.4 Using the stop watch, calibrate the generator as follows.
Weigh the empty foam container and determine its volume.
Overfill the container with foam, measuring the time required
using a stop watch then weigh. Strike off the excess foam,
holding the strike-off plate in a horizontal position (plane of the
plate horizontal) and moving it across the top of the container
with a sawing action. Again weigh. Calculate the time required
per cubic metre [or cubic foot] of foam using the following
equation:
T
1
5TW
2
W
1
V(1)
8.4.1 Calculate also the density of the foam as follows:
W
uf
5W
2
V(2)
8.4.2 Calculate the length of time required to generate the
required volume of foam, V
f
T
1
, as follows:
SI Units:
V
f
T
1
51000 V
a
T
1
1000 2W
uf
(3)
Inch-Pound Units:
V
f
T
1
5
62.4 V
a
T
1
62.4 2W
uf
(4)
8.4.3 Calculate the mass, W
f
, of the required volume of
foam, V
f
W
uf
.
NOTE 1—The density of the foam will usually range from 30 to 65
kg/m3[2 to 4 lb/ft
3
] depending on the foam chemical used. Adjust the
density of foam, W
uf
, to the manufacturer’s recommendation if the foam
generator is adjustable.
8.4.3.1 If Type I cement is used, weigh out 26.0 – W
f
kg
[58.0 – W
f
lb] of water, W
w
, and 45.0 kg [100.0 lb] of Type I
cement.
8.4.3.2 If Type III cement is used, weigh out 29.0 – W
f
kg
[64.0 – W
f
lb] of water, W
w
, and 45.0 kg [100.0 lb] of Type III
cement.
8.5 Wet the mixer with water and drain. Add the water, W
w
,
and start the mixer. Gradually add the cement (over a period of
1
⁄
2
min). With a trowel, break up any lumps of undispersed
cement. Mix for 5 min.
8.6 While still mixing, add V
f
m
3
[ft
3
] of foam. The required
foam time is V
f
T
1
. Mix for 2 min after all the foam has been
added. Discharge the mixer into the pump feed reservoir.
Immediately, proceed to 8.7.
8.7 Weighing—Fill a tared weighing container with a repre-
sentative sample of the concrete in the reservoir. Before taking
the sample, carefully mix the concrete in the reservoir to assure
better uniformity without entrapping large air bubbles in the
mix. Use a paddle of proper size to reach the bottom of the
reservoir. Use a scoop to transfer the concrete to the container
and tap the sides of the container briskly with the rubber
hammer during the filling operation. Overfill the container and
strike off the excess concrete, holding the strike-off plate in a
horizontal position (plane of plate horizontal) and moving it
across the top of the container with a sawing motion. Wipe the
surface of the container free of spilled concrete with a cloth.
Weigh the full container. Calculate the density of the concrete
and record as the density before pumping (D
ex1
).
8.7.1 Pump the batch of concrete through the 15-m [50-ft]
hose, discharging it into a sampling basin. From the sampling
basin, take a second density sample as in 8.7, weigh, and record
as the density after pumping (D
ex2
).
8.8 Molding—Immediately, fill the cylinder molds with
concrete from the sampling basin. Tap the sides of the mold
with the rubber hammer while the mold is being filled. The
minimum number of specimens required is four cylinders, 75
by 150 mm [3 by 6 in.] and ten cylinders 150 by 300 mm [6 by
12 in.].
8.8.1 As soon as possible after casting, strike off the top
surface of each specimen and cover the specimen with a plastic
bag to prevent evaporation, without marring the surface.
8.9 Removal from Molds and Curing— Follow the appli-
cable requirements of the Test Specimen section of Test
Method C495/C495M with the following exception: continue
air drying from day 25 to day 28 in place of oven drying the
specimens. Do not oven dry specimens that are to be load-
tested.
C796/C796M − 19
3