Designation: C1574 −04 (Reapproved 2018)
Standard Guide for
Determining Blown Density of Pneumatically Applied Loose-
Fill Mineral Fiber Thermal Insulation
1
This standard is issued under the fixed designation C1574; the number immediately following the designation indicates the year of
original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. A
superscript epsilon (´) indicates an editorial change since the last revision or reapproval.
1. Scope
1.1 This guide describes two alternate procedures for deter-
mining blown density at a predetermined thickness or a range
of thicknesses expected in field applications of mineral fiber
loose-fill insulation.
1.2 This guide involves blowing a sample of loose-fill
insulation into a test frame of known volume, measuring the
weight of the insulation captured and calculating the blown
density.
1.3 This guide is intended for pneumatically-applied loose-
fill mineral fiber insulation designed for use in horizontal open
attic spaces.
1.4 This guide is intended for product design and product
auditing by manufacturers of loose-fill insulation. This guide is
adaptable as a plant quality control procedure.
1.5 This guide does not predict the aged density of the
mineral fiber loose-fill insulation.
1.6 The values stated in inch-pound units are to be regarded
as standard. The values given in parentheses are mathematical
conversions to SI units that are provided for information only
and are not considered standard.
1.7 This standard does not purport to address all of the
safety concerns, if any, associated with its use. It is the
responsibility of the user of this standard to establish appro-
priate safety, health, and environmental practices and deter-
mine the applicability of regulatory limitations prior to use.
1.8 This international standard was developed in accor-
dance with internationally recognized principles on standard-
ization established in the Decision on Principles for the
Development of International Standards, Guides and Recom-
mendations issued by the World Trade Organization Technical
Barriers to Trade (TBT) Committee.
2. Referenced Documents
2.1 ASTM Standards:
2
C168 Terminology Relating to Thermal Insulation
C1374 Test Method for Determination of Installed Thick-
ness of Pneumatically Applied Loose-Fill Building Insu-
lation
3. Terminology
3.1 Definitions—Terminology C168 is applicable to the
terms used in this standard.
3.2 Definitions of Terms Specific to This Standard:
3.2.1 Variable blown density—change in density exhibited
by loose-fill insulation as a function of thickness.
3.2.1.1 Discussion—Some loose-fill insulation materials ex-
hibit an increase in blown density when thickness increases.
Also, the original thickness may or may not decrease with time
resulting in the same or somewhat higher densities. This
thickness versus density relationship should be considered
when developing coverage information for the bag label.
4. Significance and Use
4.1 Blown density is used to develop loose-fill coverage
charts. Data for blown density vs thickness is used in the
development of a variable blown density presentation for
loose-fill insulation.
4.2 Thermal resistance (and conductivity) of loose-fill min-
eral fiber insulation depends on density and thickness. The
resulting blown density data is useful in developing an expres-
sion for apparent thermal conductivity as a function of density.
This will in turn aid the manufacturer in developing coverage
information for packages of loose-fill insulation.
4.3 The blown density obtained in this method is for the
thickness of the test only. The relationship of blown density
with thickness can be determined by repeating the procedures
outlined here using different thicknesses.
4.4 These procedures are not the same as the test method
described in Test Method C1374. Depending on the test
1
This guide is under the jurisdiction of ASTM Committee C16 on Thermal
Insulation and is the direct responsibility of Subcommittee C16.32 on Mechanical
Properties.
Current edition approved Sept. 1, 2018. Published November 2018. Originally
approved in 2004. Last previous edition approved in 2013 as C1574 – 04 (2013).
DOI: 10.1520/C1574-04R18.
2
For referenced ASTM standards, visit the ASTM website, www.astm.org, or
contact ASTM Customer Service at service@astm.org. For Annual Book of ASTM
Standards volume information, refer to the standard’s Document Summary page on
the ASTM website.
Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States
This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the
Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
1
conditions utilized, the blown density may, or may not,
represent the installed density values obtained by using Test
Method C1374.
4.5 This guide can be used to develop appropriate blowing
machine settings to achieve a target blown density at a
predetermined thickness.
5. Summary of Guide
5.1 A standardized test chamber of fixed volume is used to
collect the pneumatically-applied insulation.
5.2 There are two types of test chambers that are in common
use:
5.2.1 Procedure A uses a moveable test box having a
minimum volume of 20 cubic feet (0.56 m
3
) . The blown
material is weighed while still in the test box and the density is
calculated.
5.2.2 Procedure B uses a fixed frame assembly in a test
room or blowing shack to simulate an attic application. The
blown material is removed from the test frame and weighed
separately to calculate the density.
5.3 After the insulation is blown into the chamber, the
weight of the insulation is determined.
5.4 From the volume of the sample and its weight, the
blown density is determined.
6. Apparatus
6.1 Blowing Machine—a commercial pneumatic blowing
machine, designed for handling mineral fiber loose-fill insula-
tion materials, shall be used for blowing the insulation into the
test chamber. This machine shall have throughput and handling
characteristics representative of that used in field applications.
6.2 Blowing Hose—the machine shall utilize three (3) 50 ft
(15 m) sections to make up 150 ft (46 m) of a minimum of 3
in. (76 mm) diameter flexible corrugated blowing hose. At least
100 ft. (30 m) of the hose shall have an elevation of between
10 and 20 ft (3 and 6 m) above the blowing machine to
simulate a typical installation configuration. The hose shall
have no more than eight 90-degree bends and no bends may be
less than 4 ft (1.2 m) radius. After 50 h of usage, the last 50 ft
(15 m) section at the discharge end shall be discarded. A new
50 ft (15 m) shall be attached directly to the blowing wool
machine. The remaining 100 ft (30 m) shall then be attached to
the end of the new hose. This creates a hose replacement
rotation.
6.3 Scales—platform scales or load cells accurate to 1 %.
6.4 Specimen Preparation Room—an enclosed area where
the test material is to be blown into the test chamber. This area
is required to protect the blowing operation from wind or
strong air currents. Room geometry should provide adequate
clearance around the test chamber and large enough not to
influence the blowing stream from the hose.
6.5 Hose Nozzle Stand—a hose stand on casters that holds
the blowing hose at a fixed height of 36 to 48 in. (0.9 to 1.2 m)
and is on a swivel that allows the operator to swing the hose
horizontally back and forth while slowly moving backwards
and forwards to fill the test chamber. A typical hose nozzle
stand is shown in Fig. 1. Use of the hose stand is optional.
6.6 Moveable Test Chamber (Procedure A)—a wooden open
container to collect the insulation. The chamber shall have a
minimum capacity of 20 ft
3
(0.57 m
3
) and have the minimum
inside dimensions of 11 in. high by 28 in. wide by 80 in. long
(279 mm by 711 mm by 2032 mm). Note that these minimum
dimensions by themselves do not produce the required volume
but simply represent the minimum B, C, and D dimensions in
Fig. 2. The front of the test chamber is typically angled at 45
degrees to insure proper filling as the operator moves back
during the filling operation. A typical test chamber is shown in
Fig. 2.
6.7 Fixed Test Chamber (Procedure B)—joists are built up
on a plywood floor to simulate an open attic structure.
Typically 2 in. by 10 in. (50 mm by 254 mm) joists, 16 in. (406
mm) on center, are used to create three sections that are 19 ft
long (5.8 m). The joists are marked along their length at 6 in.
(152 mm) intervals so that the total insulation volume can be
determined after the blowing is completed. A typical test
chamber is shown in Fig. 3.
6.8 Compressed air supply, hose, and nozzle.
6.9 Straight edged screed.
7. Procedure
7.1 Procedure A–Moveable Test Chamber:
7.1.1 Within the sample preparation area, position the empty
and clean test chamber on the scale and so that the test chamber
is approximately centered side to side and from front to back.
7.1.2 Tare the scale/load cells.
7.1.3 Affix the appropriate blowing hose to the blowing
machine and, if used, secure the exit hose end in the hose
nozzle stand.
7.1.4 Set the blowing machine with the desired gear, gate
opening, and air pressure settings required to obtain the blown
insulation conditioning that is representative of a field blown
application.
7.1.5 Load the appropriate amount of loose-fill in the
blowing machine hopper.
7.1.6 Start the blowing machine and direct the hose and
material flow to the side away from the test chamber. Verify
proper air pressure by checking machine gauge or blown
material arc length.
7.1.7 If blowing by hand, position the end portion of the
blowing hose horizontal to the floor at all times and at a
minimum of 3 ft (0.9 m) and a maximum of 4 ft (1.2m) above
the floor of the test chamber.
7.1.8 When the insulation is flowing smoothly (about 10-20
s) begin filling the test chamber. Fill the test chamber from
back to front using a slow sweeping motion from side to side
overlapping all sides of the test chamber by at least one foot.
7.1.9 Slowly and uniformly move backwards and forwards
to uniformly fill the chamber and capture the most representa-
tive stream of blown material.
7.1.10 When the chamber is full, direct the hose away from
the test fixture and stop the machine.
C1574 − 04 (2018)
2
FIG. 1 Hose Nozzle Stand
FIG. 2 Movable Test Chamber – Procedure A
C1574 − 04 (2018)
3
摘要:

ASTM C1574-04 (2018) 是由美国材料与试验协会(ASTM)发布的关于柔性多孔材料的标准规范,主要针对用于隔热、隔音及缓冲应用中的闭孔柔性聚烯烃泡沫材料。该标准详细规定了材料的物理性能、尺寸稳定性、热导率、吸水率及阻燃性能等关键指标,适用于建筑、暖通空调、汽车和工业设备等领域。通过遵循该规范,制造商和用户可确保材料在实际应用中具备一致的质量与可靠性,同时有助于产品在市场竞争中符合国际认证要求。

展开>> 收起<<
ASTM C1574 - 04 (2018).pdf

共5页,预览4页

还剩页未读, 继续阅读

声明:本文档系会员上传,若文档所含内容侵犯了您的版权或隐私,请立即通知,我们立即给予侵权申诉删除!
作者:Carl 分类:国外协会 价格:12星币 属性:5 页 大小:212.14KB 格式:PDF 时间:2024-09-02

开通VIP享超值会员特权

  • 多端同步记录
  • 高速下载文档
  • 免费文档工具
  • 分享文档赚钱
  • 每日登录抽奖
  • 优质衍生服务
/ 5
客服
关注