conditions utilized, the blown density may, or may not,
represent the installed density values obtained by using Test
Method C1374.
4.5 This guide can be used to develop appropriate blowing
machine settings to achieve a target blown density at a
predetermined thickness.
5. Summary of Guide
5.1 A standardized test chamber of fixed volume is used to
collect the pneumatically-applied insulation.
5.2 There are two types of test chambers that are in common
use:
5.2.1 Procedure A uses a moveable test box having a
minimum volume of 20 cubic feet (0.56 m
3
) . The blown
material is weighed while still in the test box and the density is
calculated.
5.2.2 Procedure B uses a fixed frame assembly in a test
room or blowing shack to simulate an attic application. The
blown material is removed from the test frame and weighed
separately to calculate the density.
5.3 After the insulation is blown into the chamber, the
weight of the insulation is determined.
5.4 From the volume of the sample and its weight, the
blown density is determined.
6. Apparatus
6.1 Blowing Machine—a commercial pneumatic blowing
machine, designed for handling mineral fiber loose-fill insula-
tion materials, shall be used for blowing the insulation into the
test chamber. This machine shall have throughput and handling
characteristics representative of that used in field applications.
6.2 Blowing Hose—the machine shall utilize three (3) 50 ft
(15 m) sections to make up 150 ft (46 m) of a minimum of 3
in. (76 mm) diameter flexible corrugated blowing hose. At least
100 ft. (30 m) of the hose shall have an elevation of between
10 and 20 ft (3 and 6 m) above the blowing machine to
simulate a typical installation configuration. The hose shall
have no more than eight 90-degree bends and no bends may be
less than 4 ft (1.2 m) radius. After 50 h of usage, the last 50 ft
(15 m) section at the discharge end shall be discarded. A new
50 ft (15 m) shall be attached directly to the blowing wool
machine. The remaining 100 ft (30 m) shall then be attached to
the end of the new hose. This creates a hose replacement
rotation.
6.3 Scales—platform scales or load cells accurate to 1 %.
6.4 Specimen Preparation Room—an enclosed area where
the test material is to be blown into the test chamber. This area
is required to protect the blowing operation from wind or
strong air currents. Room geometry should provide adequate
clearance around the test chamber and large enough not to
influence the blowing stream from the hose.
6.5 Hose Nozzle Stand—a hose stand on casters that holds
the blowing hose at a fixed height of 36 to 48 in. (0.9 to 1.2 m)
and is on a swivel that allows the operator to swing the hose
horizontally back and forth while slowly moving backwards
and forwards to fill the test chamber. A typical hose nozzle
stand is shown in Fig. 1. Use of the hose stand is optional.
6.6 Moveable Test Chamber (Procedure A)—a wooden open
container to collect the insulation. The chamber shall have a
minimum capacity of 20 ft
3
(0.57 m
3
) and have the minimum
inside dimensions of 11 in. high by 28 in. wide by 80 in. long
(279 mm by 711 mm by 2032 mm). Note that these minimum
dimensions by themselves do not produce the required volume
but simply represent the minimum B, C, and D dimensions in
Fig. 2. The front of the test chamber is typically angled at 45
degrees to insure proper filling as the operator moves back
during the filling operation. A typical test chamber is shown in
Fig. 2.
6.7 Fixed Test Chamber (Procedure B)—joists are built up
on a plywood floor to simulate an open attic structure.
Typically 2 in. by 10 in. (50 mm by 254 mm) joists, 16 in. (406
mm) on center, are used to create three sections that are 19 ft
long (5.8 m). The joists are marked along their length at 6 in.
(152 mm) intervals so that the total insulation volume can be
determined after the blowing is completed. A typical test
chamber is shown in Fig. 3.
6.8 Compressed air supply, hose, and nozzle.
6.9 Straight edged screed.
7. Procedure
7.1 Procedure A–Moveable Test Chamber:
7.1.1 Within the sample preparation area, position the empty
and clean test chamber on the scale and so that the test chamber
is approximately centered side to side and from front to back.
7.1.2 Tare the scale/load cells.
7.1.3 Affix the appropriate blowing hose to the blowing
machine and, if used, secure the exit hose end in the hose
nozzle stand.
7.1.4 Set the blowing machine with the desired gear, gate
opening, and air pressure settings required to obtain the blown
insulation conditioning that is representative of a field blown
application.
7.1.5 Load the appropriate amount of loose-fill in the
blowing machine hopper.
7.1.6 Start the blowing machine and direct the hose and
material flow to the side away from the test chamber. Verify
proper air pressure by checking machine gauge or blown
material arc length.
7.1.7 If blowing by hand, position the end portion of the
blowing hose horizontal to the floor at all times and at a
minimum of 3 ft (0.9 m) and a maximum of 4 ft (1.2m) above
the floor of the test chamber.
7.1.8 When the insulation is flowing smoothly (about 10-20
s) begin filling the test chamber. Fill the test chamber from
back to front using a slow sweeping motion from side to side
overlapping all sides of the test chamber by at least one foot.
7.1.9 Slowly and uniformly move backwards and forwards
to uniformly fill the chamber and capture the most representa-
tive stream of blown material.
7.1.10 When the chamber is full, direct the hose away from
the test fixture and stop the machine.
C1574 − 04 (2018)