沙特阿美公司材料系统规范 34-SAMSS-001 多相流量计 2019 Multi-phase Flow Meters

VIP专免
标准之家 2026-09-13 6 465.28KB 29 页 25星币
侵权投诉
Previous Revision: 30 May 2019 Next Revision: 20 November 2024
Contacts: (enezima) and (benlizix) Page 1 of 29
©Saudi Aramco 2019. All rights reserved.
Materials System Specification
34-SAMSS-001 20 November 2019
Multi-phase Flow Meters
Document Responsibility: Multi-phase Flow Meters Standards Committee
Contents
Revision History ....................................................... 2
1 Scope ................................................................ 3
2 Conflicts and Deviations ................................... 3
3 References ........................................................ 3
4 General Requirements ...................................... 6
5 MPFM Technical Requirements ........................ 8
6 Environmental Conditions ............................... 13
7 Design ............................................................. 14
8 Testing and Inspection .................................... 23
9 Shipping Requirements ................................... 24
10 Documentation ................................................ 25
Appendix A - Definitions .......................................... 28
Appendix B - Acronyms and Abbreviations ............. 29
Document Responsibility: Multi-phase Flow Meters Standards Committee 34-SAMSS-001
Publish Date: 20 November 2019
Next Revision: 20 November 2024 Multi-phase Flow Meters
Saudi Aramco: Company General Use
©Saudi Aramco 2019. All rights reserved. Page 2 of 29
Revision History
28 May 2013 New Saudi Aramco Materials System Specification.
7 September 2016 Major revision. Update MPFM technical requirements. As stated the 34-SAMSS-001 has
been developed to address a gap where neither international nor a Saudi Aramco general
specification for multi-phase flow metering solution were present, implementing and
developing this standard has shown to enhance safety, quality and reliability. It has also
facilitated the commoditization of a previously customized processes (project specific). It has
streamlined all the processes related and around MPFM. This revision is a result of all
lessons learned and best practices using the SAMSS for three years in all MPFM related
activities.
30 May 2019 Editorial revision to:
- Revised “Conflicts and Deviations” to be in line with the Technical Deviation Approvals of
SAEP-302.
- Replace cancelled SAEP-103 with SAEP-301 and cancelled SAEP-3102 with SAEP-31.
- Correct title of SAEP-302 and SAEP-1151.
- Removed brand name “Microstation” in paragraph 10.12.
20 November 2019 Editorial revision to extend Next Revision date.
Document Responsibility: Multi-phase Flow Meters Standards Committee 34-SAMSS-001
Publish Date: 20 November 2019
Next Revision: 20 November 2024 Multi-phase Flow Meters
Saudi Aramco: Company General Use
©Saudi Aramco 2019. All rights reserved. Page 3 of 29
1 Scope
1.1 This Saudi Aramco Materials System Specification (SAMSS) defines the
minimum mandatory requirements for engineering, design, fabrication, and
testing of multi-phase flow meters (MPFM) with its associated components for
all Saudi Aramco fields and facilities.
1.2 This entire standard may be attached to and made a part of purchase orders.
2 Conflicts and Deviations
Any conflicts between this document and other applicable Mandatory Saudi Aramco
Engineering Requirements (MSAERs) shall be addressed in writing to the EK&RD
Coordinator.
Any deviation from the requirements herein shall follow internal company procedure
SAEP-302, Waiver of a Mandatory Saudi Aramco Engineering Requirement.
3 References
3.1 All MPFM equipment shall meet the requirements of this Saudi Aramco
Materials System Specification and other applicable SAMSSs, project
specifications, project drawings, ISS Data Sheet, referenced codes and
standards, Inspection and Testing Requirements (Form A-175), and
Non-material Requirement Forms (NMRs).
3.2 The selection of material and equipment and the design, construction,
maintenance, and repair of equipment and facilities covered by this SAMSS
shall comply with the latest edition of the references listed below, unless
otherwise noted.
3.3 Other than the requirements of this SAMSS and the referenced mandatory Saudi
Aramco standards, the vendor can use their own standard design, equipment,
and materials based on international standards and industry codes.
3.4 Saudi Aramco References
Saudi Aramco Engineering Procedures
SAEP-31 Corporate Equipment and Spare Parts Data
Requirements
SAEP-144 Multi-phase Flow Meters Radioactive Sources Handling
and Management Procedure

标签: #MS #材料 #沙特

摘要:

本页面提供沙特阿美公司材料系统规范 34-SAMSS-001《多相流量计》2019版(Multi-phase Flow Meters)的SEO优化内容。该规范适用于石油、天然气及油气水多相流在线计量场景,规定多相流量计在沙特阿美项目中的设计、选型、制造、检验、测试、标识、包装、运输及文件提交等最低技术要求。通过34-SAMSS-001,供应商、承包商、设计院和采购方可确认设备是否符合沙特阿美材料系统标准,并满足质量、安全、可追溯性和项目合规要求。本内容适用于投标报价、供应商资格预审、技术评标、设

展开>> 收起<<
沙特阿美公司材料系统规范 34-SAMSS-001 多相流量计 2019 Multi-phase Flow Meters.pdf

共29页,预览3页

还剩页未读, 继续阅读

声明:本文档系会员上传,若文档所含内容侵犯了您的版权或隐私,请立即通知,我们立即给予侵权申诉删除!
作者:标准之家 分类:国际标准 价格:25星币 属性:29 页 大小:465.28KB 格式:PDF 时间:2026-09-13

开通VIP享超值会员特权

  • 多端同步记录
  • 高速下载文档
  • 免费文档工具
  • 分享文档赚钱
  • 每日登录抽奖
  • 优质衍生服务
/ 29
客服
关注